Kentucky Six-Year Road Plan
Louisville Area Summary

This is a summary of important Louisville area projects identified in the Kentucky Transportation Cabinet's Recommended FY 2003-2008 Six-Year Highway Plan.

The first two years are incorporated into state law. That is, various phases for construction projects have been approved, funding has been set aside for FY 2003-2004, and consturction is expected to take place.

Most projects listed here are Access and Mobility projects, including widenings, interchange reconstruction, new routes and interchanges, and extensions. Most projects consisting entirely of pavement rehabilitation and/or bridge replacements are not included here.

Project ID numbers are listed in abbreviated form; all projects listed here are in District 5. The project listed as 41.0, for example, would encompass Item Nos. 05-41.00 to 05-41.09 in the Six-Year Highway Plan.

Disclaimer

While every attempt has been made to ensure that the information presented here is correct, I offer no guarantees as to its accuracy, timeliness, fitness for any particular purpose, colorfastness, or taste. If you want complete and accurate information I suggest you contact the Kentucky Transportation Cabinet themselves.

Projects new to the FY 2003-08 Highway Plan (or not previously listed here) are marked with a "*" in the Project ID field.

The List of Projects

        FISCAL YEARS IN WHICH
PROJECT ACTIVITY SHOULD COMMENCE
ID#     DESIGN  R.O.WAY UTIL    CONS    DESCRIPTION
-------------------------------------------------------------------------------

JEFFERSON COUNTY
21.0            2005-08 2007    2008    Reconstruct Snyder/I-64 interchange
28.0            2002    2002    2004-06 Construct New Watterson/Westport Road
                                        interchange
28.1                            2003    Widen Westport Road from Hubbards Lane
                                        to Watterson
28.2                            2003    Widen Westport Road from Watterson to
                                        Herr Ln
41.0            2006-08 2007    2008    Reconstruct Snyder/US-60 interchange
48.0    2002-03 2005    2007    2007    Widen I-71 from I-64 to Snyder to
                                        3 lanes each direction
52.0            2004-06 2006    2007-08 Reconstruct WB I-64 to SB Hurstbourne
                                        ramp as loop
65.0    2003                            Widen I-64 from Snyder to KY 53
91.0            2003    2004    2005    Widen River Road from Beargrass Creek
                                        to Zorn Ave
119.0                           2006    Construct new Bunsen Pkwy from
                                        Bluegrass Ind Pk to Shelbyville Rd
122.0           2003    2003    2005    Major Revision of Intersection of
                                        Outer Loop, Fegenbush Ln, and Beulah
                                        Church Rd
159.0   2004                            Widen WB I-64 to WB Watterson ramp
                                        to 2 lanes for entire length
247.1           2002    2003    2006    Widen Blue Lick Rd from Snyder to
                                        Preston Highway
247.2   2002    2005    2006            Widen Blue Lick Rd from Snyder to
                                        Bullitt County line
261.2                           2002    Jefferson Blvd extension from Northern
                                        Ditch to Poplar Level Road
                                        (UNDER WAY)
*320.0          2003    2003    2004    "Traffic Flow Improvement" on KY 22
                                        around the Snyder
322.0                           2002    Extension of Hurstbourne Parkway from
                                        Bardstown Rd to Fern Valley Rd
                                        (UNDER WAY)
323.0           2002    2004    2006    Widen Greenwood Rd from Greenbelt Hwy
                                        to Dixie Hwy
325.0                           2002    Widen Westport Road from Herr Lane to
                                        Hurstbourne Parkway
                                        (R/W, UTIL CONSTRUCTION IN PROGRESS)
344.0   2003-05 2006    2006            Widen Southbound Hurstbourne Pkwy to
                                        3 lanes from US 60 to I-64
353.0           2002    2002    2004    Widen English Station Rd to 3 lanes
                                        from Avoca Rd to Aiken Rd
373.0           2006    2006            Reconstruct/Widen Watterson Tr
                                        from Plantside Dr to Blankenbaker Rd
387.2                           2003    Widen Stonestreet Rd to 3lns from
                                        Snyder to Valley Station Rd
401.0           2003    2003    2005    Extend Blankenbaker Rd from Blankenbkr.
                                        Access Rd to Taylorsville Rd
403.0           2002    2003    2004    Widen Cooper Chapel Rd from Preston
                                        Hwy to Smyrna Rd to add turn lane
405.0           2002    2003    2004    Widen Johnsontown Rd to add turn lane
                                        from Mahoney Dr to Black Pond Creek
406.0           2003    2003    2004    Reconstruct one-lane bridge to 2 lanes
                                        on River Rd over Harrods Creek
*419.0                          2002    Reconstruct Johnsontown Rd in vicinity
                                        of Riverport Industrial Park
430.0                           2002    Widen 2nd St from Jefferson to Broadway
                                        (UNDER WAY)
*964.0                          2002    Reconstruct Warnock/Crittenden/I-65
                                        intersection to correct sight distance
                                        and wrong turn movements
*972.0          2004    2004    2006    Add turn lane on US 42 between Fox
                                        Harbor Ln and River Rd
*972.01                         2002    Add turn lane on US 42 from Harrods Crk
                                        to River Rd
*981.0          2002    2002    2003    Align offset intersection at Outer Loop
                                        and Vaughn Mill; signalize
*982.0          2003    2004    2004    Improve Trevilian Way/Poplar Level Road
                                        intersection
8000.0          2002    2002    2004    Widen Bashford Manor Ln from Newburg
                                        Rd to Gladden Dr; replace 2-lane bridge
        * - Projects new to the FY 2003-08 Highway Plan, or not previously
            listed on this page

Pavement, bridges, turn lanes, etc.
15.0                            2004    Watterson Expwy: wash/paint all bridges
                                        and bearings
63.0                            2005    Sherman-Minton Bridge: inspection
64.0                            2004    Sherman-Minton Bridge: painting
110.0                           2004    2nd Street Bridge: wash/paint
118.1   2002-03                         Bridges Project: phase II design
118.2           2004                    Bridges Project: environmental
                                                remediation; right-of-way
118.3                           2006-08 Bridges Project: construction
136.0                           2004    Gene Snyder Fwy: wash/paint all bridges
                                        and bearings
139.0           2002    2003    2004    Fegenbush Ln: realign from Poplar Level
                                        Road south for .05 mile and construct
                                        new bridge at Fern Creek
141.0                   2002    2002    Add left turn lane on KY 22 and Murphy
                                        Lane and correct sight distance problem
142.0                   2002    2003    Add left turn lane on KY 22 at KY 1694
402.0                           2002    Replace Four Bridges:
                                        - Breckenridge St over S Fork Beargrass
                                        - Oak St over S Fork Beargrass
                                        - Payne St over Beargrass Crk
                                        - Schuff Ave over Beargrass Creek
1023.0          2002    2002    2003    Replace Bridge on KY 2265 @ Floyds Fork
1026.0          2005    2005    2006    Replace Bridge on US 60 @ Floyds Fork
1027.0  2002    2003    2003    2004    Replace Bridge on Old Taylorsville Rd
                                        at Cane Run
1038.0  2005    2007    2007    2008    replace bridge over Big Run
2000.0                          2002-05 Pavement Rehab: I-264 from I-64 to
                                        Crums Ln
2001.0                          2002    I-264 from Crums Ln to KY 1931 ?
2002.0                          2003    Pavement Rehab: Snyder Freeway from
                                        wast of KY 864 to east of Billtown Rd
2021.0                          2005    Pavement Rehab: Outer Loop from
                                        Briarcliff Rd to Shepherdsville Rd
2022.0                          2005    Pavement Rehab: Fern Valley Road
                                        from Ulrich to Grade Lane
2026.0                          2002    Pavement Rehab: Dixie Highway from
                                        MP14.59 to MP14.96
2029.0  2004                    2006-07 Mill/Intermediate Overlay: I-71
                                        from Gene Snyder to MP21.6
2030.0                          2005    Thin Overlay: I-64 from east of the
                                        Watterson to the Snyder

Exact Nature Not Known
311.6                           2002    TCSP funds: Waterfront Redevelopment
383.0-384.0                     2003-04 Louisville Rideshare Program
400.0                           2002    Bike/Ped Facilities in Louisville Area
420.0                           2002    TCSP funding for Fegenbush Ln
965.0                           2005    STP Funds for KIPDA
1012.                   2003-05 2003-06 TRIMARC Construction

OLDHAM COUNTY
230.1                           2004    Reconstruct KY 393 from KY 22 to I-71
234.0           2004    2004    2006    Reconstruct KY 393 from I-71 to north
                                        of KY 146
304.0                           2006    Widen KY 22 from Pryor Ave to KY 393
367.0           2004    2005    2007-08 Construct New Route from Snyder/Old
                                        Henry Rd to Crestwood Bypass

BULLITT COUNTY
117.0                   2003            Widen KY 61 from existing 4-lane to
                                        Shepherdsville
117.1                           2008    " Section 1: from south of KY 44 to
                                          north of Pointe Blvd.
117.2                           2008    " Section 2: from north of Pointe Blvd
                                          to south of Brooks Run
117.3                           2007    " Section 3: from south of Brooks Run
                                          to existing 4-lane
150.0   2003(P)                         Study possiblity of adding turn lanes
                                        on KY 44 between Shepherdsville and
                                        Mount Washington
347.5   2006    2008    2008            Reconstruct KY 44 from Mt. Washington
                                        Bypass east 2 miles
        (P) - Preliminary engineering, public coordination

SHELBY COUNTY
158.0   2004                            US 60: Improve existing 4-lane and
                                        extend 4-lane road from KY 53 to
                                        Shelby County High School
326.0                   2003    2004    Northern Bupass of Shelbyville from
                                        US 60W to KY 55 N
348.0   2002    2006    2007            Widen KY 1848 to 5 lanes from I-64
                                        to US 60

PREVIOUSLY LISTED IN 2000 ROAD PLAN
These projects are not listed in the 2002 Road Plan.  Some are under way;
others may have been shelved.

Completed
435.2   2000                            Aux. lane construction: SB I-65 access
                                        ramp from Grade Ln to Fern Valley Rd
                                        exit ramp
76.0                            2001-03 Extend 9th St from Kentucky St to
                                        7th and Myrtle
-------------------------------------------------------------------------------
Under Way
93.0                            2001-03 Widen National Turnpike from Southside
                                        Dr to Outer Loop, to 5 lanes
248.0                           2001    Widen New Cut Rd from Snyder to
                                        Third Street Rd
385                             2002    Widen Gilmore Ln from Preston Hwy to
                                        Poplar Level Rd
386                             2002    Widen Indian Tr from Poplar Level Rd
                                        to Unseld Blvd
435.6           2000    2000            Reconnection of Crittenden Drive
                                        around Louisville International Airport
-------------------------------------------------------------------------------
Unknown
378.1   2000                            SB I-65 to Brook St ramp extension
                                        and reconstruction
404     2000                            STUDY: extension of Cooper Chapel Rd
                                        from Beulah Church Rd to Bardstown Rd
435.4           2001    2001    2001    New Aux. Lane on Fern Valley Rd along
                                        north side from Grade Lane to UPS
                                        connector street
8001.0  2001    2002    2002    2004    Widen Buechel Bank Rd to 3 lanes from
                                        Appliance Park to Buechel Bypass